How we estimate
Each estimate adds up equipment, materials, labor and fees. Nothing is copied from other cost guides; the inputs are public data and our stated assumptions.
Labor
Labor = hours for the job × billed hourly rate × area factor. The billed rate starts from the national median wage for the trade from the U.S. Bureau of Labor Statistics (May 2025) and multiplies it by 3.5 by default. Contractors bill well above what they pay: employer payroll taxes, workers' comp and liability insurance, vehicles and tools, licensing, office and travel time that can't be billed, and profit. Our low and high columns use 2.5× and 5×. You can change the multiple in every calculator.
| Trade (BLS) | Median wage | Billed at 3.5× |
|---|---|---|
| Plumbers, pipefitters and steamfitters | $30.67 | $107 |
| Electricians | $30.38 | $106 |
| Carpenters | $29.12 | $102 |
| Roofers | $26.65 | $93 |
| HVAC mechanics and installers | $29.33 | $103 |
| Construction laborers and helpers | $22.44 | $79 |
| General maintenance and repair workers | $23.84 | $83 |
Area factors: lower-cost area ×0.85, average ×1, higher-cost area ×1.25, very high-cost metro ×1.5. They apply to labor only.
Hours
Labor hours are our estimates of the time a competent crew spends on the scope described, including setup and cleanup. They're shown in each line so you can compare them with what a contractor tells you.
Equipment and materials
Typical retail prices for the item (low, typical and high grades), checked against current retailer and manufacturer listings on 16 Nov 2026. Contractors may add a markup on equipment they supply.
What's not included
- Repairs discovered during the job (rot, code violations, structural work), except where a line says so
- Sales tax
- Dealer-brand systems sold with financing or long service plans, which are often priced far above these figures
These are planning estimates, not quotes. Get at least two itemized quotes for any job over a few hundred dollars.